Building control site inspections

Please tell us what you think about our website, we welcome your feedback.

Customer notice

Due to essential maintenance some of our web services will be unavailable between these times 7pm Friday 25 May and 5pm Sunday 27 May 2012.

In case of any emergencies please see our Facebook or Twitter pages.

Shortcuts for building control site inspections

Site inspections

We see our inspection service as a key part in the success of your project, ensuring that the work your builder does complies with the regulations, and helping them with advice in that context.

Inspections are carried out at a number of stages during the building process. These are set out below with notes which may assist you or your builder. If we look at two examples, a kitchen extension and a loft conversion, you will see the typical inspections that may be required and why we need to inspect.

Kitchen extension or any typical extension to a dwelling

Commencement

This is usually for information only and will often be combined with the inspection for the excavations.

Excavations

This inspection is to ensure that the ground upon which the building is to be founded is satisfactory. The Building Control Surveyor will consider various aspects during this inspection, including:

  1. The load bearing capacity of the ground.
  2. The proximity and depth of any drains and manholes.
  3. Any indication of filled ground, (generally or limited areas).
  4. The depth of existing foundations.
  5. Proximity of trees or trees already removed
Damp proof course (DPC) and oversite

The main points will be:

  1. The suitability of any hardcore used.
  2. Sand blinding to protect the damp-proof membrane (DPM).
  3. Checking that the DPM is of the correct thickness.
  4. Checking that any joints are rolled or taped up.
  5. Checking that sufficient DPM is left turned up the walls to tie in with DPC (both new and existing).
  6. Checking that the floor insulation is laid with tight joints and turned up the edge of the slab.

This is an ideal time to also discuss with your builder the wall, roof (and floor if two storey) specifications to ensure that the superstructure will comply with the regulations. This is particularly important if a Building Notice has been used.

Underground drainage

A number of details including those listed below will be looked at on this inspection and the request should be submitted before the drains are backfilled.

  1. Suitability of layout used.
  2. Fall and line of drain.
  3. Material used for bed and surround.
  4. Access points.
Superstructure (walls, floors and roofs)

Checking that what was discussed at DPC stage has been built, including sizes of timbers, spacing’s, lateral restraint to walls/roofs, bracing and any other structural requirements.

Drainage test

An air or water test of all above and below ground drainage is required. It is helpful if the test can be set up and ready for the Building Control Surveyors’ visit. It is appreciated that this may cause difficulty when existing drains are affected. To assist you in this situation a timed appointment can generally be arranged.

Completion

This is the key inspection for which notification is most often forgotten.

A thorough inspection is carried out to check all is ok. If it isn’t, we will tell you what the outstanding issues are so you can rectify them with your builder.

Once the works have been rectified we will re-inspect and ‘sign off’ the project closing the file.

You will then be issued with a Completion Certificate for the project. This is an important document and should be kept in a safe place. Should you sell your property in the future the purchasers solicitor will ask to see a copy of this.

Loft conversion either to a bungalow or two storey house

Commencement

This is usually for information only but will also allow us to meet your builder and look at the general structural and fire safety arrangements. It may also be possible to combine this with an inspection of the existing foundations and structure.

Expose existing foundations and structure

There are systems on the market that will carry the loads to the outside walls. But if a more traditional design is used we may need to check that the existing structure can take the increased loads, particularly if some loads are carried by inside (partition) walls.

Structural framework

In the majority of loft conversions some input is usually required from a structural engineer. Their role is to design the structural support frame to show compliance with the regulations ensuring also that the builder can build it. We check the finished frame against any engineers’ details and confirm if. this is acceptable or not.

Insulation requirements

Checking that all floor and roof insulation is to regulations and fitted properly.

Fire safety

Checking that the required arrangements are in place to meet the minimum standards.

Completion

See kitchen extension notes above.

Contact Details (LiveLink)

Multiple Contacts:
eMail: buildingcontrolnorth@wiltshire.gov.uk
Telephone: 01249 706674
Out of hours: 0845 056 8035
Fax:
Postal Address: Building Control
Wiltshire Council
Monkton Park
Chippenham
SN15 1ER
In Person:
DX:

Contact Details (LiveLink)

Multiple Contacts:
eMail: buildingcontrolsouth@wiltshire.gov.uk
Telephone: 01722 434519 or 01722 434523
Out of hours: 0845 056 8035
Fax:
Postal Address: Wiltshire Council
PO Box 2281
Salisbury
SP2 2HX
In Person: Wiltshire Council
27-29 Milford Street
Salisbury
Wiltshire
SP1 2AP
DX:

Contact Details (LiveLink)

Multiple Contacts:
eMail: buildingcontroleast@wiltshire.gov.uk
Telephone: 01380 734777
Out of hours: 0845 056 8035
Fax:
Postal Address: Building Control
Wiltshire Council
County Hall
Bythesea Road
Trowbridge
Wiltshire
BA14 8JN
In Person:

Wiltshire Council
Shurnhold Offices
Shurnhold
Melksham
Wiltshire
SN12 8GQ

Please note you will need to make an appointment before coming to the office using the above email or telephone number.

DX:

Contact Details (LiveLink)

Multiple Contacts:
eMail: buildingcontrolwest@wiltshire.gov.uk
Telephone: 01225 770321
Out of hours: 0845 056 8035
Fax:
Postal Address: Building Control
Wiltshire Council
165 Bradley Road
Trowbridge
BA14 0RD
In Person:

Wiltshire Council
Shurnhold Offices
Shurnhold
Melksham
Wiltshire
SN12 8GQ

Please note you will need to make an appointment before coming to the office using the above email or telephone number.

DX:

Last updated: 16 February 2012

Actions

Search

This website