Introduction
Wiltshire Council and Swindon Borough Council jointly prepare Minerals and Waste Development Plan Documents (DPDs), which cover the geographical areas of Wiltshire County and Swindon Borough.
Consultations
For information on any current, or recent, consultations on minerals and waste documents, please click on the link below.
Minerals and Waste Development Plan Documents (DPDs)
The adopted minerals and waste documents are available to download from this page. Click on the quick links in the table below to go straight to the relevant document, or to further information on those documents that are currently in preparation.
| Document | Status |
|---|---|
| Minerals Core Strategy DPD | Adopted June 2009 |
| Waste Core Strategy DPD | Adopted July 2009 |
| Minerals Development Control Policies DPD | Adopted September 2009 |
| Waste Development Control Policies DPD | Adopted September 2009 |
| Minerals and Waste Proposals Map | Published September 2009 |
| Waste Site Allocations DPD | In preparation |
| Aggregate Minerals Site Allocations DPD | In preparation |
Minerals Core Strategy
The Minerals Core Strategy DPD sets out the spatial vision, key objectives and overall principles for development covering minerals provision up to 2026.
Wiltshire Council and Swindon Borough Council formally adopted the Minerals Core Strategy in June, 2009.
The adopted Minerals Core Strategy is available to download below, along with the Inspector’s Report and Sustainability Appraisal.
Minerals Core Strategy June 2009 3.6mb
Minerals Core Strategy Key Diagram 200kb
Minerals and Waste Core Strategies Adoption Statement July 2009 21kb
Minerals Core Strategy Inspector's Report March 2009 188kb
Minerals Core Strategy Inspector's Report March 2009 Appendix 1 441kb
Minerals Core Strategy Final Sustainability Appraisal March 2008 Main Report 5.5mb
Minerals Core Strategy Final Sustainability Appraisal March 2008 Non-Technical Summary 145kb
Minerals Core Strategy Final Sustainability Appraisal March 2008 Appendices 2.1mb
Minerals Core Strategy Sustainability Appraisal Adoption Statement July 2009.pdf 95kb
Waste Core Strategy
The Waste Core Strategy DPD sets out the spatial vision, key objectives and overall principles for development covering the provision of sustainable waste management facilities up to 2026.
Wiltshire Council and Swindon Borough Council formally adopted the Waste Core Strategy, in July 2009.
The adopted Waste Core Strategy is available to download below, along with the Inspector’s Report and Sustainability Appraisal.
Waste Core Strategy July 2009 2.1mb
Waste Core Strategy Key Diagram 347kb
Minerals and Waste Core Strategies Adoption Statement July 2009 21kb
Waste Core Strategy Inspector's Report April 2009 347kb
Waste Core Strategy Final Sustainability Appraisal March 2008 Main Report 1.4mb
Waste Core Strategy Final Sustainability Appraisal March 2008 Non-Technical Summary 118kb
Waste Core Strategy Final Sustainability Appraisal March 2008 Appendices A-H 3.6mb
Waste Core Strategy Sustainability Appraisal Adoption Statement July 2009 133kb
Minerals Development Control Policies
The Minerals Development Control Policies DPD sets out a limited suite of generic development control policies designed to assist with the process of determining planning applications for minerals development.
Wiltshire Council and Swindon Borough Council formally adopted the Minerals Development Control Policies DPD in September, 2009.
The adopted Minerals Development Control Policies DPD is available to download below, along with the Inspector’s Report and Sustainability Appraisal.
Adopted Minerals Development Control Policies DPD September 2009 676kb
Minerals Development Control Policies DPD SA Adoption Statement 166kb
Minerals Development Control Policies DPD - Inspector's Report - May 2009 139kb
Minerals Development Control Policies DPD - Inspector's Report Appendix - Schedule of Proposed Changes to Submission Draft 301kb
Minerals Development Control Policies - Final Sustainability Appraisal - Main Report 5.4mb
Minerals Development Control Policies - Final Sustainability Appraisal - Non-Technical Summary 131kb
Minerals Development Control Policies - Final Sustainability Appraisal - Appendices 950kb
Waste Development Control Policies DPD
The Waste Development Control Policies DPD sets out a limited suite of generic development control policies designed to assist with the process of determining planning applications for sustainable waste management development.
Wiltshire Council and Swindon Borough Council formally adopted the Waste Development Control Policies DPD in September 2009.
The adopted Waste Development Control Policies DPD is available to download below, along with the Inspector’s Report and Sustainability Appraisal.
Adopted Waste Development Control Policies DPD September 2009 655kb
Waste Development Control Policies DPD Inspector's Report - May 2009 270kb
Waste Development Control Policies DPD SA Adoption Statement 133kb
Waste Development Control Policies - Final Sustainability Appraisal - Appendices 2.0mb
Minerals and Waste Proposals Map
A final proposals map for the Wiltshire and Swindon Minerals and Waste Development Framework was published in September, 2009, and is available to download below.
Contact Details (LiveLink)
Multiple Contacts:
eMail: mineralsandwastepolicy@wiltshire.gov.uk
Telephone: 01225 713429
Out of hours:
Fax:
Postal Address:
Spatial Planning Team
Wiltshire Council
County Hall
Bythesea
Road
Trowbridge
Wiltshire
BA14
8JN
In Person:
DX:
Related information
- Annual Monitoring Report
- Statement of Community Involvement
- Local Development Scheme
- Waste Evidence Base
- Minerals Evidence Base
Last updated: 30 January 2012